Description
60505 Thane of Fife spent eighty-five days in Doncaster Works being rebuilt as a Class A2/2, the heavy overhaul taking place between 26 October 1942 and 18 January 1943 and the Diagram 118 boiler was fitted during a general overhaul at Doncaster between 29 January and 7 March 1952. 60505 Thane of Fife was allocated to Peterborough’s New England shed at this time, home to the ‘Lodge Link’ crews and as a result, Thane of Fife tended to work longer distance freight and passenger diagrams to Newcastle, as well as working turns to York and Kings Cross.
Technical Specification & Detail
| Gauge | 00 |
| Finish | Standard |
| Length | 295mm |
| DCC Type | DCC Ready |
| Period | Era 5 (1956 – 1968) |
| Class | A2/2 |
| Designer | Edward Thompson |
| Entered Service | 1943 |
| Minimum Curve | R2 |
| Age Suitability | 14+ |
| Motor | 5 Pole Skew Wound |
| Wheel Configuration | 4-6-2 |
“




Reviews
There are no reviews yet.